Planning tool · Pergola
Pergola Builder
Size the frame, check post and footing placement, and price a contractor-style material list. Every span over 12 ft automatically gets a center support post, and the top-view / elevation blueprints redraw as you adjust the plan.
- Attached / freestanding / louvered
- 12 ft bay rule built in
- Live BOM + editable US prices
Center support posts automatically added
16 ft projection → 2 bays. Every bay is held to 12 ft or less, so the carrying beams and rafters stay within a safe span.
Largest bay
12 ft
≤ 12 ft limit
Rafter spacing
24" O.C.
7 rafters
Footings
4
4 bags each · 36" deep
Setbacks
8 / 5 ft
Rear / side · US
- Area
- 192 sq ft
- Posts
- 4
- Concrete
- 16 bags
- Frost
- 36" deep
- Setbacks
- 8 / 5 ft
- Est. Material Total
- $2,180
HOA & Permit Submittal Reference Pack
Hand one reference pack to your HOA, your AHJ, and your bidders
Print or save a reference pack with three vector sheets — Site Plan & Setbacks, Framing & Post Layout, and Front Elevation & Frost Footing — plus a title block, prescriptive code screen, footing depths, setback distances, and the full bill of materials. You can also copy the plain-text quote request or download the same package for a submittal file.
- Structure
- Attached · Western Red Cedar
- 4" shade purlin spacing
- Footprint & Clear Height
- 12×16 ft
- 192 sq ft · 9 ft clear
- Frost Footing Depth
- 36" below grade
- 4 footings · 18" sonotube
- Max Bay & Rafters
- 12 ft max bay
- 24" O.C. · 7 rafters
- State & Code Screen
- National Default (US)
- 120 sq ft detached exempt · No climate overlay
- Property Line Setbacks
- Rear 8 ft · Side 5 ft
- Meets the 5 ft minimum most HOA and zoning rules expect
Print opens your browser dialog with three vector sheets, the code notes, and the BOM.
Runs entirely in this browser. No email, ZIP code, or account required.
Every bay is held to 12 ft and every footing to 36" below grade, so bidders quote the same frame.
FAQ · Pergola builder
Pergola spacing, footings & permit questions
The structural answers homeowners ask before digging the first footing.